You need to upgrade your Flash Player to view this content.
Click here to get Flash Player
Cleaning Membrane
Services Compressor
Lab Analysis
Changing RO filter / Activated Carbon
Preparation CSDS / MSDS
Chimney Installation Approval Application
Consultation Services for Module 3 & 4 WWTP
Supervisor to attend Project Site
To Endorse Drawing
Services And Repair Airman
DOSH Submission
DOE Submission
Test Parameter
Standard B
Design Consultation on Clarifier
Design Claculation for Clarifi
Drawing provided
Civil and Structural IR Endors
To Initial Noise Monitoring at the indicated work area
Regulation 9 of Factories and Machinery(noise Exposure) Regulation 1989
To Fabricate Flywheel Coupling Disc Screw Stud
Rental Mixed Bed Columns
To Obtain DOE Approval for Installation of Air Emission Exhaust System
Waste Water Characterization Study (WWCS)
Supply labours and material to perform waste water characteristic study
Material to Install Chemical Piping
Chemical Health Risk Assessment
Under Regulation 5 & 9 of Occupation Safety and Health
Use Standard of Exposure chemicals Hazardous to Health – Regulation 2000
Approval Application
To carry out sand blasting machine operation approval application at the indicated work area as per required by factories and machinery(Mineral Dust) Regulation 1989
Supply and install new Vertical Counter
Quality Management System (QMS) – ISO 9001:2000
Chemical Handling & Management
Environmental Management System (EHS) – ISO 14001:2004
OHSAS 18001:1999
Chemical handling & Safety Awareness
Environmental Aspect & Impact Analysis
Clause by Clause of EMS Training